The roof is performing better in this new temporary state, and with strong winds and very heavy snow loads and lots of rain, it kept everything dry inside, although missing some fascia boards and gutters, I’m getting a fair amount of water accumulating around the foundation.

I could say I planned it this way to test my drains and bring them into good functionality, but the truth is that’s just a happy coincidence, because at the end of the gutters the water pours down and forms a lake right next to the lowest part of the earth around the foundation.

So with the heavy rains, the drains (after much modification, are finally handling  water infiltration very well, although not without some sleepless nights  sweeping water to the drain and chiseling deeper channels in the concrete floor- (I knew there was a reason I didn’t tile the greenhouse right away).

So now that the drains are really working, maybe it’s time to actually add some gutters and take all that water over to the actual planned destination, a pipe that goes under the driveway into the kitchen garden.

I have been upstairs rearranging, cleaning if you will, but really it’s just a warehouse, with space at a premium, and there’s only so much condensing and organizing a person can do before it’s time to let stuff go.

I’m inheriting a bunch of pretty nice stuff from my mom’s house, so it can replace the crap I was using, unfortunately it’s tough for me to throw away anything that’s still functional. So the skeletal additions to the roof  are waiting for clear floor space around the miter saw as well as enough floor space to install the rafters.

I do have some high hopes that I might actually start to move forward on this project in the near future, especially since the first cleaning steps are mostly inside out of the weather. That reminds me, it’s nice out and I left some crap by the door that needs to go somewhere else. Stay tuned.